2018-07-01

Liverpool Street S.C.C. Chingford Interlocking Upgrade

Design And Manufacture of Power and Signalling

Graybar Have designed and built both Power and Signalling equipment to assist MECX in the upgrade of an R.E.B at Chingford, Essex, the brief was to design, build and supply a 650V power Switch, and also GRP Dis Boxes, for the new Signal, these along with additional Cable Management Products, demonstrates Graybar's capability in many aspects of project delivery.